Home
Couldnt Care less?
Network Rail is undergoing major refreshing of track and signals in the Barnham to Havant area https://www.networkrail.co.uk/running-the-railway/our-routes/sussex/upgrading-the-brighton-main-line/barnham-to-havant-improvement-works/ . Part of this work involves the closure of 2 major level crossins (Stockbridge Road and Basin Road) at the same time to both traffic and pedestrians. The only way to cross the line is to use the footbridge.
So therefore I realised that any motobility scootter, wheelchair or any other person unable to cross the footbridge would need an alternative route.
So i asked Network Rail
"
@networkrailwith the closure of both level crossings at #chichesterthis and next weekends to both vehicles and pedestrians, and with only the footbridge open, how are you maintaining #accessforall#,#Disability #wheelchairs"
Graylingwell
The old pumphouse and water pipe channel
{gallery}articles/chichester/grayling{/gallery}
Page 3 of 3